Projects

Project Name Cost Client Scope of Services
Providing Consultancy services for preparing GADs of Bridges, detailed design and drawing and other allied works as per schedule in connection with proposed doubling of existing railway line between Katni- SingrauIi 261 km long of west centre railway 1763 Crore Railways 1.32 km of doubling of existing single track
Consultancy work for preparation of detailed project report for Elevated road (viaduct) from krishi Mandi circle to Akhaliya circle via Sojati gate in Jodhpur 1200 Crore Urban Development Authority,Jodhpur 9.8 km log Elevated Road with 270m long cable stayed Bridge
Providing consultancy services for preparing General Arrangement drawing, detailed design and drawings for viaduct, Minor bridges, Box culverts in Railway Alignment and road over bridges on road crossings and other allied consultancy works as per schedule in connection with the construction of a new dual gauge Agartala -Akhaura rail link project. 1100 Crore Eastern Railway ROBs Viaducts, Box Culverts with 3.50Km long elevated corridor
Development of NH SC (New NH 147) passing through Chiloda -Gandhinagar -Sarkhej,Gujarat 856 Crore National Highways Authority of India (NHAI) 8 nos Flyovers, 2 nos VUP 4km Elevated Corridor
Consultancy Service for preparation of Detailed Project Report for Railway Overbridge at Various Locations on DFCC Route between Ahmedabad to Palanpur in State of Gujarat. 811 Crore DFCC 10 km length of railway with round about interchange for NHAI for LC-165
Carrying out location Survey, Geotechnical studied, preparation of design & drawing and other preliminary activities in connection with construction of new BGline between Udhana to Jalgaon section of Mumbai division 138 Crore Western Railway Doubling of 306.93 km broad gauge line
Design Consultancy services for "construction / up gradation of Dhoridungri - Garasiyawada(km 0+000 to 12+338) section of VR/ MDR & construction / rehabilitation Lunawada - Garasiyawada (km 0+006 to 13+937) section of SH -63" 88 Crore R & B Gujarat Road design work with 800mt long major bridge
Engagement of Consultant Consultancy services for construction of bridge connecting North campus from Ghoda farm on Kataula Khad and Cycle track connecting northand south campusof IIT Mandi at Kamand" 29.50 Crore IIT Mandi 120 mtr Continuos Arch Integral Bridge & 2.0 km long cycle track o Hill Terrain